Our use of cookies

We use necessary cookies to make our site work. We’d also like to set optional analytics cookies to help us improve it. We won’t set optional cookies unless you enable them. Using this tool will set a cookie on your device to remember your preferences.

For more detailed information about the cookies we use, see our cookie policy.


Analytics cookies

We’d like to set Google Analytics cookies to help us to improve our website by collecting and reporting information on how you use it. The cookies collect information in a way that does not directly identify anyone.

:


Share this page on:

Subsea 7 awarded contract offshore Australia

Subsea 7 announced the award of a large (1) contract by ConocoPhillips Australia Barossa Pty Ltd to deliver the SURF scope for the Barossa Project (2). The Barossa field is located 300 km offshore Darwin in the Northern Territory of Australia.

Subsea 7’s scope of work includes project management, engineering, procurement, fabrication, transportation, installation and pre-commissioning of 36 km of flowlines and associated client-supplied risers, umbilicals and subsea structures in water depths between 230 and 270 metres. The offshore work scope is scheduled to occur in 2022 and 2023, using Subsea 7’s reel-lay and heavy construction vessels.

Andy Woolgar, Vice President Australia and New Zealand for Subsea 7, said: “We are delighted to be working on this prestigious project which will utilise the full range of installation and pipelay capabilities that we have in Australia and illustrates how Subsea 7’s global technology portfolio allows us to deliver cost-effective solutions to our clients worldwide.” 

 
(1) Subsea 7 defines a large contract as between USD 300 million and USD 500 million.

(2) The Barossa Project is a Joint Venture between ConocoPhillips Australia Barossa Pty Ltd (the Operator) (37.5%), SK E&S Australia Pty Ltd (37.5%) and Santos Offshore Pty Ltd (25%). The development is currently awaiting final investment decision.